Two-dimensional interface drawings are accepted in DXF or DWG, and three-dimensional assemblies in STEP or IGES. If only a PDF is available it must carry measurable dimensions; a screenshot alone cannot be used for modelling. We return interface review comments within one to two working days, and 3D modelling plus tooling design begin only after both sides sign off the flange bolt circle, dowel locations, hydraulic pressure and return sides, and the service access envelope. The usual cause of rework is not file format but missing annotation: an outer flange diameter with no bolt circle, reversed hydraulic sides, or omitted dowel holes. Our 2026 interface confirmation sheet lists all 18 required parameters and is available on request.
English
简体中文