Split the routine into pre-shift and post-shift, about 15 minutes total. Pre-shift, five items on a walk-around: look for missing shoe bolts by checking the witness-mark lines for displacement; eyeball track sag against the manual's reference; scan rollers and final drives for fresh oil trails; clear mud from grease fittings and relief ports; check the track for embedded objects. Post-shift, two items: shoot every roller housing with an IR gun after running and log temperatures (flag any neighbor gap over 15 degrees C), and record hours plus anything unusual. Interval tasks layer on top: torque verification and regreasing every 250 hours, full roller measurement and grease sampling every 500 hours. Keep the checklist as a laminated card on the machine and retain records for at least a year - they are the traceability base for warranty and resale.
English
简体中文