What Is the Lead Time for a Customized Steel Track Undercarriage Order?

What is the lead time for a customized steel track undercarriage order? 25-35 days with confirmed drawings, 40-55 days for new track chain profiles.

Plan on 25 to 35 days for a customized steel track undercarriage when the drawing is confirmed and the standard track chain and sprocket sizes are used; allow 40 to 55 days for a new custom track chain profile, a special frame or a first-time tooling setup. The schedule covers frame welding, machining, assembly, load testing, painting and export preparation. MAGEON keeps customized steel track chassis and customized rubber track undercarriage on a similar cycle because the frame and drive engineering are shared. Early confirmation of the interface drawing shortens the build, and one set MOQ applies throughout.