Standard factory release has four stages: dimensional and interface bolt pattern recheck; 100% visual weld inspection plus 100% magnetic particle inspection on critical welds; a 1.25x rated static load hold and simulated 20 degree gradient parking on the load test rig; and a four-hour continuous run recording roller and final drive temperature curves. A load test report is issued and the unit released only when all stages pass. Reports are archived by chassis serial number and linked to material heat numbers, consumable batches and WPS/PQR identifiers, and ship with the goods. Buyers who need the data for a supplier audit can request strain gauge readings, eccentric load records or third-party witnessed testing, but these must be named at quotation stage.